Bucket dredge A S Mayne
The 800 litre bucket dredge A S Mayne was constructed at Cockatoo Island Dockyard for the Melbourne Harbor Trust, and was allocated ship/job number 239. It was ordered on 12 September 1974, laid down on 24 February 1975, launched on 29 May 1976 and completed in March 1977. Named after the chairman of the Melbourne Harbor Trust Commissioners, Mr Arthur Stanley Mayne, it was 169 feet long, with a full load displacement of approximately 1 600 tons. These records will be available to the public when they are 30 years old.
| RECORDS OF THE DIRECTOR OF PRODUCTION RELATING TO THE CONSTRUCTION OF BUCKET DREDGE A S MAYNE, 197476 | M3046 |
 | Quantity: 0.72 metres |
| |
| FILES RELATING TO THE CONSTRUCTION OF BUCKET DREDGE A S MAYNE, 197477 | M2980 |
| Quantity: 0.72 metres |
| |
| INDEX TO WORKING DRAWINGS OF BUCKET DREDGE A S MAYNE, 197478 | M2758 |
| Quantity: 0.18 metres |
| |
| CORRESPONDENCE FILES RELATING TO BUCKET DREDGE A S MAYNE, 197478 | M2800 |
| Quantity: 0.72 metres |
| |
| HEADLINE AND STERNLINE WINCH DRAWINGS OF BUCKET DREDGE A S MAYNE, 1975 | M2982 |
| Quantity: 0.18 metres |
| |
| INSTRUCTION, MAINTENANCE, AND SERVICING MANUALS TO PARTS AND MACHINERY FOR BUCKET DREDGE A S MAYNE, 1975 | M2981 |
| Quantity: 0.36 metres |
| |
| AS FITTED AND WORKING HULL, MECHANICAL AND ELECTRICAL DRAWINGS OF BUCKET DREDGE A S MAYNE, 197577 | M2755 |
| Quantity: 4.14 metres |
| |
| REGISTER TO WORKING DRAWINGS OF BUCKET DREDGE A S MAYNE, 197577 | M2757 |
| Quantity: 0.18 metres |
| |
| SUNDRY SKETCHES OF BUCKET DREDGE A S MAYNE, 1976 | M2878 |
| Quantity: 0.18 metres |
|